TOTAL BUILDING SQUARE FEET:

  • NEW GYMNASIUM = 85,239 SQUARE FEET (INCLUDING MECHANICAL MEZZANINES)

TOTAL PROJECT CONSTRUCTION COSTS:

  • NEW GYMNASIUM, CAFETERIA EXTENSION, SITE WORK = $11,472,300

PROJECT HIGHLIGHTS:

  • 4800 PEOPLE SEATING CAPACITY
  • INCREASED CAFETERIA SEATING AREA
  • 5 – LOCKER ROOMS
  • 4 – COACHES OFFICES
  • 5 – STORAGE ROOMS
  • 6 – NEW PUBLIC RESROOMS
  • 3 – CONCESSIONS
  • TRAINING ROOM
  • 2 – MEDIA VIEWING/SEATING AREAS
  • INSTANT ON/OFF HIGH OUTPUT AND ZONED LIGHTING
  • NEW TECHNOLOGY INFRASTRUCTURE
  • 4 – SIDED SCOREBOARD
  • 4 – SIDED MESSAGE CENTER
  • AUTO DEPLOY PROJECTOR AND PROJECTION SCREEN
  • TWO FULL CROSS COURTS
  • UPPER LEVEL ACCESS TO LOWER LEVEL SEATING
  • CONSTRUCTED IN 12 MONTHS

 

16-JasperHighGymNEW GYMNASIUM FOUNDATION CONSTRUCTION

  • To support the load of the new gym structure, a total of 250 steel piles were driven into bedrock.
  • The steel piles were driven to a minimum depth of 26 feet and a maximum depth of 96 feet.
  • Concrete pile caps were constructed over the steel piles. The entire weight of the structure rests on the concrete pile caps.

 

 

 

 

 

 

INSURANCE:

Steven Morris – Hanover Insurance
John Gunselman – GAB

SCHOOL CORPORATION ATTORNEY

Arthur Nordhoff

STATE AND LOCAL OFFICIALS

Carl Deel – State Fire Marshall
Kenny Hochgesang – City of Jasper Fire Chief
Jasper Fire Department and First Responders
Jasper Police Department
Dubois County Sherriff Department

OLD GYMNASIUM DEMOLITION

O’Rourke Wrecking – Demolition Engineering
Jasper Lumber Company – Temporary Wall Construction

NEW GYMNASIUM PLANNING DESIGN

VPS Architecture – Architect
Lynch Harrison Brumleve – Structural Engineer
CMTA – Mechanical Engineer
Bledsoe, Riggert, Guerrettaaz – Civil Engineer

NEW GYMNASIUM CONTRACTORS

Empire Contracting – General Construction
HFI Mechanical – Mechanical Contractor
Weyer Electric – Electrical Contractor

CLERK OF THE WORKS – PROJECT MANAGEMENT

THE STENFTENAGEL GROUP L.L.C.

SPECIAL THANKS TO THE FOLLOWING:

SCHOOL ADMINISTRATION

Dr. JerrillVandeventer (Previous Superintendent)
Dr. Tracy Lorey – Superintendent
Mike Hile – (Previous Assistant Superintendent)
Bob Hacker – (Previous Assistant Superintendent And Principal)
Brian Wilson – Principal
Andy Noblitt – Athletic Director
Nancy Habig – Board President
Bernie Vogler – Board Vice President
Mike Braun – Board Secretary
Greg Eckerle – Board Member
Ken Schnaus – Board Member